Perform an audit of the Town's irrigation system.
(According to the action plan)

Description

In July 2022, the Town worked with Northern Water to complete audits at Children's Park, Little Sagamore Park, and Big Sagamore Park. These audits happened post-Marshall Fire and were designed to support the recovery process in a water-wise way. The Town also worked with Aqua Engineering to complete a full irrigation assessment and audit at Community Park in August of 2022.

New updated and more efficient irrigation systems and less turf was a focus of park re-builds at Big and Little Sagamore Parks and Children's Park. The Turf Reduction Grant helped to fund removal of a triangular turf area on the SE corner of the 88th round-a-bout, xeriscape and drip irrigation replaced spray irrigation with the added benefit of less over-spray onto sidewalks and roadways. In 2024 a large section of the Rock Creek Parkway median from the underpass near McCaslin to Indiana was transitioned to xeriscape removing all turf and spray irrigation and replacing with drought-tolerant plantings and drip irrigation.

status last confirmed: May 2025

Summary and contacts

  • H2O Use Reduction Potential

    Marginally reduces
  • Cost

Information updated 05/12/2025